{"id":84652,"date":"2015-05-15T11:00:47","date_gmt":"2015-05-15T09:00:47","guid":{"rendered":"https:\/\/www.stage-kinetik.de\/portfolio\/germanys-next-topmodel-finale\/"},"modified":"2020-09-07T09:03:24","modified_gmt":"2020-09-07T07:03:24","slug":"germanys-next-topmodel-finale","status":"publish","type":"portfolio","link":"https:\/\/www.stage-kinetik.de\/en\/portfolio\/germanys-next-topmodel-finale\/","title":{"rendered":"Germany&#8217;s Next Topmodel Finale"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;]<\/p>\n<h1>Germany&#8217;s Next Topmodel Finale 2015<\/h1>\n<div class=\"ce_text grid9 rund10 block\">\n<p>On the 14th of May 2015, the great final of the 10th season of Germany&#8217;s Next Topmodel took place in the SAP Arena in Mannheim. The show started with a stunning opening. Regrettably, it had to be canceled due to a bomb threat so that not all of our technical refinements could be seen. Fortunately, the bomb threat turned out to be a hoax. Nevertheless, it was a shock for all those involved.<\/p>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_single_image image=&#8221;84640&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; onclick=&#8221;link_image&#8221; parallax_scroll=&#8221;no&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;]<\/p>\n<h4>Flying platform for Heidi Klum and curved trusses on chain hoists<\/h4>\n<p>The show was opened with Heidi Klum standing on a flying platform, which was hung on chain hoists and covered with a fabric, while floating on it from the ceiling to the stage. The upper fabric attachments could be released using a\u00a0<a href=\"https:\/\/www.stage-kinetik.de\/en\/specials\/\">KABUKI system<\/a>\u00a0so that the platform with the presenter on it was disclosed during the flight.<\/p>\n<p>Concentric\u00a0<a href=\"https:\/\/www.stage-kinetik.de\/en\/vermietung\/\">curved trusses<\/a>\u00a0were attached to the ceiling around the flying platform. The trusses were hooked on\u00a0<a href=\"https:\/\/www.stage-kinetik.de\/en\/vermietung\/\">DGUV V17 Movecat chain hoists as per SIL3<\/a>\u00a0and could be moved individually. A total of 25 chain hoists was attached to 5 curved trusses, whereas a total weight of 9500 kilograms was applied to the hall ceiling.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column]\t\t<div id=\"gallery_338\" class=\"wd-images-gallery wd-wpb photoswipe-images\" style=\"--wd-justify-content:center;--wd-align-items:center;\">\n\t\t\t\n\t\t\t<div class=\" wd-grid-g\" style=\"--wd-col-lg:3;--wd-col-md:3;--wd-col-sm:1;--wd-gap-lg:10px;\">\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"wd-gallery-item wd-col\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-4.jpg\" data-elementor-open-lightbox=\"no\" data-index=\"1\" data-width=\"1920\" data-height=\"1280\" \n\t\t\t\t\t\t\t\t\t\t\t\t >\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-4.jpg\" class=\"wd-gallery-image image-1\" alt=\"Gntm 2015 4\" srcset=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-4.jpg 1920w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-4-150x100.jpg 150w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-4-1536x1024.jpg 1536w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-4-768x512.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"wd-gallery-item wd-col\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-2.jpg\" data-elementor-open-lightbox=\"no\" data-index=\"2\" data-width=\"1920\" data-height=\"1280\" \n\t\t\t\t\t\t\t\t\t\t\t\t >\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-2.jpg\" class=\"wd-gallery-image image-2\" alt=\"Gntm 2015 2\" srcset=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-2.jpg 1920w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-2-150x100.jpg 150w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-2-1536x1024.jpg 1536w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-2-768x512.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"wd-gallery-item wd-col\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-3.jpg\" data-elementor-open-lightbox=\"no\" data-index=\"3\" data-width=\"1920\" data-height=\"1280\" \n\t\t\t\t\t\t\t\t\t\t\t\t >\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-3.jpg\" class=\"wd-gallery-image image-3\" alt=\"Gntm 2015 3\" srcset=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-3.jpg 1920w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-3-150x100.jpg 150w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-3-1536x1024.jpg 1536w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-3-768x512.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t[\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;]<\/p>\n<h4>Lifting platform with 3 meter curved truss used for the opening<\/h4>\n<p>A\u00a0<a href=\"https:\/\/www.stage-kinetik.de\/en\/vermietung\/\">lifting platform<\/a>, with a diameter of 3 meters and a lifting height of 2.27 meters, was installed below the flying platform in the stage floor. The plate was supported by a TT curved truss.[\/vc_column_text][vc_column_text text_larger=&#8221;no&#8221;]<\/p>\n<h4>LED wall (16 x 8 meters) with 5328 kilograms of load applied to the hall ceiling<\/h4>\n<p>The\u00a0<a href=\"https:\/\/www.stage-kinetik.de\/en\/specials\/\">LED wall<\/a>\u00a0was 16 meters wide, 8 meters high and had a weight of 3900 kilograms. It consisted of 4 elements which could be moved on a 28 meter long\u00a0<a href=\"https:\/\/www.stage-kinetik.de\/en\/specials\/\">EHB track<\/a>. Together with the tracks, trusses and chain hoists, a weight of 5328 kilograms was applied to the hall ceiling. A light matrix, which was hung of using 2 chain hoists, was located behind the LED wall.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column]\t\t<div id=\"gallery_812\" class=\"wd-images-gallery wd-wpb photoswipe-images\" style=\"--wd-justify-content:center;--wd-align-items:center;\">\n\t\t\t\n\t\t\t<div class=\" wd-grid-g\" style=\"--wd-col-lg:2;--wd-col-md:2;--wd-col-sm:1;--wd-gap-lg:10px;\">\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"wd-gallery-item wd-col\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-5.jpg\" data-elementor-open-lightbox=\"no\" data-index=\"1\" data-width=\"1920\" data-height=\"1280\" \n\t\t\t\t\t\t\t\t\t\t\t\t >\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-5.jpg\" class=\"wd-gallery-image image-1\" alt=\"Gntm 2015 5\" srcset=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-5.jpg 1920w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-5-150x100.jpg 150w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-5-1536x1024.jpg 1536w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-5-768x512.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"wd-gallery-item wd-col\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-6.jpg\" data-elementor-open-lightbox=\"no\" data-index=\"2\" data-width=\"1920\" data-height=\"1280\" \n\t\t\t\t\t\t\t\t\t\t\t\t >\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1280\" src=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-6.jpg\" class=\"wd-gallery-image image-2\" alt=\"Gntm 2015 6\" srcset=\"https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-6.jpg 1920w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-6-150x100.jpg 150w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-6-1536x1024.jpg 1536w, https:\/\/www.stage-kinetik.de\/wp-content\/uploads\/2020\/09\/GNTM-2015-6-768x512.jpg 768w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t[\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;]<\/p>\n<div class=\"ce_text grid9 block\">\n<div class=\"ce_text grid9 block\">\n<h4>5 meter long treadmill<\/h4>\n<p>A 5 meter long\u00a0<a href=\"https:\/\/www.stage-kinetik.de\/en\/specials\/\">treadmill<\/a>\u00a0was installed into the floor of the center catwalk on which the Topmodel candidates were to carry out a walk with a wind machine. Due to the bomb threat, this item unfortunately had to be cancelled in the program.<\/p>\n<\/div>\n<div class=\"ce_text grid9 block\">\n<p>Photos: \u00a9 EYECATCHME<\/p>\n<\/div>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;] Germany&#8217;s Next Topmodel Finale 2015 On the 14th of May 2015, the great final of the 10th season<\/p>\n","protected":false},"featured_media":84641,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","project-cat":[122],"class_list":["post-84652","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-tv-productions"],"_links":{"self":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/portfolio\/84652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/comments?post=84652"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/media\/84641"}],"wp:attachment":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/media?parent=84652"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/project-cat?post=84652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}