{"id":84709,"date":"2014-05-05T11:00:15","date_gmt":"2014-05-05T09:00:15","guid":{"rendered":"https:\/\/www.stage-kinetik.de\/portfolio\/deutschland-sucht-den-superstar\/"},"modified":"2020-09-07T09:46:32","modified_gmt":"2020-09-07T07:46:32","slug":"deutschland-sucht-den-superstar","status":"publish","type":"portfolio","link":"https:\/\/www.stage-kinetik.de\/en\/portfolio\/deutschland-sucht-den-superstar\/","title":{"rendered":"Deutschland sucht den Superstar"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;]<\/p>\n<h1>Deutschland sucht den Superstar 2014<\/h1>\n<div class=\"ce_text grid9 block\">\n<p>RTL designed an all new stage for the live-shows of the eleventh season of the casting show &#8220;Deutschland sucht den Superstar&#8221;. Like in the years before, Stage Kinetik was rewarded to make the kinetic elements for the show.<\/p>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_single_image image=&#8221;84707&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; parallax_scroll=&#8221;no&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;]<\/p>\n<div class=\"ce_text grid9 block\">\n<div class=\"ce_text grid9 block\">\n<h4>LED wall as opening gate, 2x vertical movable LED wall and chain hoists for decoration<\/h4>\n<p>Starting point for every performance is the enormous center LED wall (5,38 y 6,72 meters, 2600 kilograms), which is made of 12 x 15 I-Lite6 moduls of Barco. It&#8217;s not only very important for the atmosphere of the candidates&#8217; performances, because it sets the mood on the whole stage; but also it is used as an opening gate. Around that wall more LED walls, also movable, were mounted: 4 x 9 O-Lite moduls of Barco (each 896 x 672 millimeters and 58 kilograms).<\/p>\n<\/div>\n<div class=\"ce_text grid9 block\">\n<p>Left and right of the stage are 2 additional LED walls installed that could be moved vertically contiguous with each other, they are hang on 8 chain hoists. At the ceiling of the hall 8 chain hoists were installed, to let artists and decoration fly. Trusses in total length of 70 meters were mounted as a &#8220;Pre-Rigg&#8221;. In total 9,3 tons hung off the ceiling of the studio.<\/p>\n<\/div>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text text_larger=&#8221;no&#8221;] Deutschland sucht den Superstar 2014 RTL designed an all new stage for the live-shows of the eleventh season<\/p>\n","protected":false},"featured_media":84708,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","project-cat":[122],"class_list":["post-84709","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","project-cat-tv-productions"],"_links":{"self":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/portfolio\/84709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/comments?post=84709"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/media\/84708"}],"wp:attachment":[{"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/media?parent=84709"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/www.stage-kinetik.de\/en\/wp-json\/wp\/v2\/project-cat?post=84709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}