Gotthard – Tunnel opening

57 kilometers through the Alps, 17 years construction time

In June 2016, the new Gotthard tunnel was officially opened with a big spectacle at its entrance. A spectacular show of dance and theater was staged by the German director Volker Hesse.

5 flying systems with winches on 2 track systems

flying systems with winches were installed on 2 track systems for the show interlude. This enabled the artists to deliver precise vertical performances in front of this LED wall. The entire sequence of this show was programmed in our system and controlled on-site.